Skip to content

Local dock building

Dock builders in Miami, FL

A new dock should fit your water, your boat, and your county's code. We connect you with vetted, licensed Miami-area dock builders — fixed and piling docks, decking, and lifts on the same project.

Miami, Miami-Dade County

Docks built for Miami water

Miami dock builds cover Belle Meade, Keystone Islands, Coconut Grove, Coral Gables waterways, and Morningside — Biscayne Bay and connected canals where new-dock construction runs through Miami-Dade DERM environmental review and has to respect seagrass beds and manatee habitat.

From Biscayne Bay to Miami River, a Miami dock has to fit the water — depth, current, boat size, and county code. Our vetted local partners build fixed and piling docks, wrap-arounds, and multi-slip layouts tuned to Miami.

What we build

What we build in Miami

From simple piling docks to multi-slip wrap-arounds — the full range of residential dock work, delivered by vetted Miami-area crews.

Fixed & piling docks

Traditional dock builds engineered for water depth, tide swing, and boat size.

Wrap-around & multi-slip docks

Multi-slip and wrap-around layouts for multiple vessels or wide shorelines.

Composite, wood & aluminum decking

Choose the decking that fits your budget, look, and maintenance appetite.

Gangways & finger piers

Articulated gangways and finger piers for tricky access or tidal water.

Power, water & lighting

Shore power, freshwater, and low-voltage lighting run by licensed partners.

Lifts integrated with the dock

Boat and PWC lifts sized to the dock and coordinated in one project.

Decking options

Composite, wood, or aluminum

Composite is the low-maintenance default for Miami — salt-tough and no splinters. Wood is cheapest up front and refinishable. Aluminum stays cooler underfoot in Florida sun. Your inspection walks through the tradeoffs for your specific dock.

Areas we serve

Areas we serve in and around Miami

Our partner crews work across Miami waterfront and the neighboring Miami-Dade County shoreline, including:

Belle MeadeKeystone IslandsCoconut GroveCoral Gables waterwaysMorningside

Local permits & conditions

Miami-Dade County permits, handled

Miami-Dade County and the State of Florida require permits for structural seawall, dock, and piling work. Our licensed partner crews handle Miami-Dade County permitting, setback rules, and marine code so you don't have to chase paperwork.

New dock construction in Miami runs through Miami-Dade DERM environmental permitting, Miami-Dade County building, and state marine code for Biscayne Bay frontage. Our licensed partner crews handle DERM, county, and state paperwork in one pass.

Licensed, insured, insurance-report ready.

Explore more

More waterfront work in and around Miami

One inspection can cover dock building, seawall repair, and more. Explore other services and nearby cities.

How it works

Three steps to done

01

Free waterfront inspection

We look at your seawall, dock, or shoreline and tell you straight what it needs — no obligation.

02

Clear scope & quote

A vetted local crew gives you an itemized quote and a plan. No guesswork, no runaround.

03

Built right, by licensed pros

Licensed, insured partners do the structural work and pull the permits. We stay your point of contact start to finish.

FAQ

Dock building in Miami — common questions

How much does dock building cost in Miami?
Miami costs depend on dock size, water depth, decking material, piling type, and any lifts or shore power. The free on-site inspection produces an itemized quote from a vetted local crew — no ballpark guesses.
Do I need a permit for dock building in Miami-Dade County?
Miami-Dade County and the State of Florida require permits for structural marine work — including seawall repair, dock construction, and piling replacement. Our licensed partner crews handle the Miami-Dade County permit and marine code process end-to-end.
How soon can a crew start in Miami?
Most Miami-area inspections are scheduled within 48 hours. Build/repair start times depend on scope and the Miami-Dade County permit timeline — the inspection gives you a realistic date, not a guess.
Does building a new dock in Miami need a DERM permit?
Yes — new dock construction on Biscayne Bay, the Miami River, or connected Belle Meade / Keystone Islands / Coral Gables canals generally requires Miami-Dade DERM environmental review on top of county building and state marine code. DERM is stricter than most Florida county environmental agencies. Our licensed Miami-area partner crews handle DERM, county, and state paperwork end-to-end.
How do seagrass beds and manatee zones change a Coconut Grove or Coral Gables dock design?
Biscayne Bay seagrass beds and manatee habitat can constrain dock footprint, pile spacing, deck-over-water area, and where a lift can go. DERM reviews all of it. Our Miami-area partner crews design the dock to fit the environmental envelope for your specific waterway — Coconut Grove, Coral Gables, or Belle Meade — instead of drawing first and asking permission later.

Free inspection

Get a free waterfront inspection

Tell us about your project. We'll match you with a vetted local crew and get you an on-site inspection and a straight quote — usually within 48 hours.

  • No cost, no obligation
  • Licensed & insured crews only
  • One point of contact, whole project

Prefer to call?

(561) 295-7645

By submitting, you agree to be contacted about your project. Each project is performed by an independent licensed, insured marine contractor.

Ready to fix your seawall or build your dock?

Free on-site inspection, statewide. One call for the whole waterfront.